Guide for Procurement of Concrete Plaster and Refuge Pit: Select the power model according to the working condition of the construction site to reduce the comprehensive construction cost
With the continuous implementation of global warehousing and logistics, commercial plants and municipal road projects, the market scale of concrete floor construction equipment maintains stable growth. With the advantages of flexible and portable, slurry lifting and finishing, the portable troweling machine becomes the standard equipment for small and medium-sized construction projects. However, many overseas engineering companies have fed back that the low-price non-standard troweling machine generally has such pain points as machine body shaking, fast blade wear, and power mismatch. Long-term use will increase labor and maintenance costs, and mastering the standardized selection logic is the key to control project expenditures.
1、 The power type of troweling machine shall be matched according to the construction scene
The main commercially available troweling machines are divided into gasoline, diesel and electric types, with obvious difference in adapting working conditions. The purchase shall preferentially match the power supply conditions of the construction site:
Gasoline troweling machine: not restricted by power line, applicable to outdoor road, suburban construction site and infrastructure projects without power supply; Mature engines such as Honda, Loncin and Lifan are available, with stable technology and universal accessories, suitable for outdoor sporadic repair projects all the year round.
Diesel troweling machine: with large torque and sufficient power, it is applicable to the construction of thick concrete, large area square and heavy load floor, with lower oil consumption, and it is not easy to be overloaded for long-time continuous operation, so it is suitable for the municipal long line road project.
Electric troweling machine: 220V/380V dual voltage optional, no tail gas, zero fault and no maintenance, extremely low use cost,
Suitable for indoor plant, epoxy floor, underground garage and other closed construction environment.
2、 The procurement must check the three core hardware to avoid poor equipment
Judging the durability of the troweling machine, it is not only based on the price, but mainly check the 3 structural configurations: first, the blade material. High-quality model adopts multiple high temperature quenching thickened manganese steel blade, hardness and toughness are balanced, and it is not easy to deform for long-term operation. Ordinary thin iron blade will be worn and uneven ground finishing will occur after using for dozens of hours; Second, the fuselage bracket. Mm thickened main support matched with heightened flat steel, matched with built-in balance ring, no running deviation, no violent beating, thin frame long time operation vibration, affecting floor flatness; Third, the protective structure. Overall thickened protective net+movable portable wheel can protect operators and transfer equipment by one person. Narrow garage and wall edging are more flexible.
3、 The project scale corresponds to the model specification to improve the construction efficiency
The operation efficiency of ANKE standard troweling machine can reach 210-280 ㎡/h, which is suitable for large area of ground in workshops, warehouses and large parking lots; Small-sized compact model is applicable to road repair in residential area and indoor corner grinding construction. Matching of large and small models can greatly shorten the construction period. Many purchasers blindly purchase large models to deal with small corners, so the equipment cannot be mobilized and can only be manually polished, but the labor cost is increased.
Model selection is the first step, while long-term stable operation is the real way to reduce costs. All ANKE troweling machines have passed a continuous 200-hour overload test, with core components covered by an 18-month warranty. Commonly used spare parts are stocked in overseas warehouses to ensure project deadlines are not delayed due to equipment downtime. We don't just sell equipment; we provide a full-cycle ground construction solution from model selection to operation and maintenance. For ongoing projects, feel free to consult us at any time, and we will provide a detailed model comparison report based on the actual conditions of your construction site.